Services

Installation

Professional installation of new workshop equipment — from delivery to handover.

Overview

We install workshop equipment to manufacturer specification and German safety standards. From lifts and wheel alignment to ADAS systems and EV test technology, every installation ends with a documented functional test.

Benefits
  • Manufacturer-compliant installation
  • Electrical and pneumatic connection
  • Functional test and handover report
  • User onboarding on site
Applications
Vehicle liftsWheel alignmentADAS calibrationBrake testersEV test equipment
Service process
  1. 01
    Site survey

    Assessment of floor load, connections and space requirements before delivery.

  2. 02
    Installation

    Assembly and connection to manufacturer specification by qualified technicians.

  3. 03
    Functional test

    Full test, calibration and handover report.

  4. 04
    Handover

    Hands-on onboarding of workshop staff at the machine.

Frequently asked
How long does a typical installation take?

Between half a day and two working days including functional test, depending on the device.

Solwix

Speak to an engineer, not a chatbot.

Describe your equipment and situation in a few lines. We will come back with a concrete proposal.